Introduction to English Version
Foreword
1 General Provisions
2 Terms and Definitions
3 Field Inspection
3.1 General Stipulations
3.2 Inspectionltems and Contents
3.3 Inspection Methods and Requirements
3.4 Records and Reports
4 Deformation Monitoring
4.1 GeneraI Stipulations
4.2 Dam Surface Deformation
4.3 Interior Deformation of Dam Body (Foundation)
4.4 Deformation of Anti-Seepage Body
4.5 Deformation of Interface, Joints (Cracks) and Interspaces
4.6 Deformation of Near-dam Bank Slope
4.7 Deformation of Underground Cavern Surrounding Rock
4.8 Monitoring Data and Results
5 Seepage Monitoring
5.1 General Stipulations
5.2 Seepage Pressure of Dam Body
5.3 Seepage Pressure of Dam Foundation
5.4 Bypass Seepage
5.5 Seepage Discharge
5.6 Seepage of Near-dam Bank Slope
5.7 Seepage of Underground Cavern
……
6 Pressure (stress) Monitoring
7 Environment Variable Monitoring
8 Automatic Monitoring System
9 Reconfiguration and Analysis of Monitoring Data
Annex A General Provisions
Annex B Field Inspection
Annex C Deformation Monitoring
Annex D Seepage Monitoring
Annex E Pressure (Stress) Monitoring
Annex F Earthquake Response Monitoring
Annex G Hydraulic Observation of Water Release
Structures
Annex H Monitoring Planning and Instrument
Management
Annex J Computation Formulae
Annex K Formats of Tables and Diagrams
(Informative Annexes)
Explanation of Wording
展开