搜索
高级检索
高级搜索
书       名 :
著       者 :
出  版  社 :
I  S  B  N:
出版时间 :
海洋平台组装与浮托安装技术(精)
0.00     定价 ¥ 198.00
湖南大学
此书还可采购5本,持证读者免费借回家
  • ISBN:
    9787030512062
  • 作      者:
    编者:Gengshen Liu//Huajun Li
  • 出 版 社 :
    科学出版社
  • 出版日期:
    2017-01-01
收藏
内容介绍
《海洋平台组装与浮托安装技术(精)》由Gengshen Liu、Huajun Li著。 This book discusses offshore platform integration technology, focusing on the floatover methodology and its applications. It also addresses topics related to safety and cost- effectiveness, as well as ensuring the success of a project through careful planning and established detailed operation procedure/working manuals, which are rarely found in the published literature. Unlike other publications in this area, the book not only includes details of technology development, but also presents real project cases in the discussion to make it more comprehensible. Each topic is illustrated with carefully created sketches to show the complex operation procedures.
展开
目录
1 Offshore Platform Topsides and Substructure
1.1 Platform Topsides
1.2 Design of Offshore Platform Topsides and Substructures
1.2.1 Topsides Design in General
1.2.2 Modular Topsides, Integrated Topsides and Single Lift Topsides
1.2.3 Jacket Design
1.3 Consideration of Construction and Integration of Topsides and Substructure
1.3.1 Platform Design Strongly Related to the Methodology of Platform Integration
1.3.2 Impact of Changing Integration Method
References
2 Platform Integration and Stationing
2.1 Self Installable Platform
2.1.1 Jack-Ups
2.1.2 SIP II Platform [9]
2.1.3 EDP [13–15]
2.2 Inshore Integration [16]
2.2.1 Inshore Topsides Integration by Heavy Lifting
2.2.2 Inshore Platform Integration by Floatover
2.2.3 Moving-in-Under [23–25]
2.3 Offshore Integration
2.3.1 Topsides Installation by HLCV [26, 27]
2.3.2 Offshore Topsides Installation by Floatover
2.3.3 Challenges and Development
2.4 Summary
References
3 Floatover Technology
3.1 Floatover Concept
3.2 Advantages of Floatover Method [7–10]
3.3 Category of Floatover Technology
References
4 HIDECK Floatover Technology
References
5 UNIDECK and SMARTLEG
5.1 UNIDECK Floatover
5.2 Comparison UNIDECK to HIDECK
5.3 UNIDECK Equipment and Operation
5.4 Advantages of UNIDECK Method Comparing to the HIDECK Method
5.5 SMARTLEG Installation Method
5.6 Application of SMARTLEG Technology [9, 10]
References
6 Catamaran Floatover
6.1 Multi-vessel Floatover
6.2 "Catamaran Floatover" Origination
6.3 Catamaran Floatover Technology
6.3.1 General Discussion
6.3.2 Catamaran Floatover Categories
6.4 Technical Challenges
6.4.1 One Extra Operation Phase
6.4.2 Mating Operation
References
7 Project Management and Planning
7.1 Offshore Installation Projects
7.1.1 Features of T&I Projects
7.1.2 Project Team and Its Main Functions [5]
7.2 Project Management and Project Organizations
7.2.1 Project Management
7.2.2 Project Organizations and Organization Charts
7.3 PM (Project Manager)
7.4 PEP (Project Execution Plan)
7.5 IM (Installation Manual)
7.6 Summary Comments
References
8 Engineering Analysis and Model Test
8.1 Engineering Plays a Vital Role in Floatover Projects
8.1.1 Engineering Team on the Project
8.1.2 Engineers—Their Quality and Challenges
8.2 Categories of Engineering Work
8.2.1 Installation Criteria Set Up
8.2.2 Analysis and Simulation Supporting Operation Procedure Development
8.2.3 Floatover Equipment Design and Qualification
8.2.4 Emergency Handling
8.2.5 On-Site Supporting
8.2.6 Model Test
8.3 Engineering Work Quality Management
8.3.1 Analysis/Design Philosophy
8.3.2 DB
8.3.3 Analysis and Design Procedures
8.3.4 Involvement in the Early Stage of the Project
8.4 Analysis and Simulation Work
8.4.1 Stability Analysis
8.4.2 Transportation Motion Simulation and Hydrodynamic Load Calculation
8.4.3 Topsides Transfer Simulation and Catamaran System Transportation
8.4.4 Floatover Simulation [2–4]
8.5 Structural Analyses
8.5.1 Global Structural Analysis
8.5.2 Topsides Integrity Checking
8.6 Design Work [5]
8.6.1 DSS (DSF) Design
8.6.2 LMU [6]
8.7 Model Test for Transportation and Floatover Operation
8.7.1 Main Contents of Model Test Specification
8.7.2 Motion Decay Test
8.7.3 Transportation Model Test
8.7.4 Pre-mating Test
8.7.5 Mating Test
8.7.6 Model Test Results and the Data Evaluation [7–9]
8.8 Summary
References
9 Operation Execution
9.1 Installation Procedures and IFC Drawings
9.2 Platform Integration Operation Activities
9.3 Task Force Management
9.4 Loadout and Pre-sailaway
9.4.1 Preparations
9.4.2 Weather Broadcasting and Tide Survey
9.4.3 Loadout Operation
9.4.4 Post Loadout and
展开
加入书架成功!
收藏图书成功!
我知道了(3)
发表书评
读者登录

温馨提示:请使用湖南大学的读者帐号和密码进行登录

点击获取验证码
登录